Migrate
Move supported content when the requirement remains valid.
Look beyond the file count
Two estates with the same storage size can need very different migration plans. Ownership, permissions, business processes and legacy technology shape the work.
What exists, what is still used, and what the target needs.
Who relies on it, who controls access, and who can make decisions.
Forms, workflows, custom code and integrations that could affect the move.
A view of the whole estate
Agree the assessment depth against your environment and decisions. Expand an area to see the kinds of evidence we review.
Scope and access are agreed before discovery. Initial discussions do not require tenant credentials.
What the work produces
Bring inventory, risks and recommendations together so technical and business owners can agree the next step.
Content, access, customizations and connected workloads.
Findings, impact, remediation needs and accountable owners.
Target considerations, tool selection, pilot candidates and wave planning.
Acceptance checks and a scoped path into remediation or delivery.
Report section / 01
A one-page picture of source, target, scale, and complexity drivers for the fictional Contoso Manufacturing environment.
| Area | Demonstration Value |
|---|---|
| Source platform | SharePoint Server 2016 (single farm) |
| Target platform | SharePoint Online (Microsoft 365) |
| Sites inventoried | 85 |
Report section / 02
Rated risks with mitigation and role-based ownership. Names of individuals never appear; owners are roles.
| Risk | Rating | Mitigation |
|---|---|---|
| Legacy workflow dependency breaks approvals | High | Modernize before wave; parallel run |
| Complex unique permissions delay cutover | High | Remodel permissions in pilot |
| Unsupported customization blocks site move | High | Retire or replace per matrix |
Report section / 03
Example phasing only. Actual wave design always depends on assessment findings.
| Wave | Demonstration Scope |
|---|---|
| Wave 0 — Pilot | Representative slice with baseline recording |
| Wave 1 — Low complexity | Team collaboration sites |
| Wave 2 — Departmental | HR and operations libraries |
Report section / 04
Migration completion is not equivalent to migration validation: source baseline, migration, destination scan, technical validation, exception handling, business sign-off.
| Area | Demonstration Check |
|---|---|
| Content | Item counts and storage reconciled per library |
| Metadata | Required columns populated; mappings verified |
| Permissions | Effective access sampled against target design |
Illustrative deliverable structure. This preview uses the existing fictional sample report and does not describe your tenant or a customer engagement.
Evidence into decisions
The assessment supports planning decisions. Production migration, modernization and ongoing support are agreed as separate work.
Agree the migration goal, source and target, decision owners and required review depth.
Review available inventory, access, content, customizations and business dependencies.
Connect findings to remediation, ownership, target design and migration constraints.
Review recommendations for tooling, pilot selection, migration waves and validation.
Move supported content when the requirement remains valid.
Resolve legacy dependencies using a supported approach.
Remove obsolete components with business-owner agreement.
Redesign where the need remains but the implementation does not fit.
Start with the context
Share the migration goal, the known constraints and the decisions your team needs to make. Agree the assessment scope before paid work begins.
A small, already-modern environment with trusted inventory, clear ownership and a narrow move may need a focused review rather than a broad assessment. The initial discussion helps establish the appropriate depth.
After the assessment
Not every environment needs every phase. Use the evidence to sequence remediation, migration and validation against business priorities.
Before you begin
Understand the scope, inputs and boundaries before deciding how to proceed.
Read the assessment guideThe agreed scope reviews content, permissions, legacy technology, customizations, connected workloads and migration readiness. Findings support a risk register, migration recommendations, sequencing and validation planning.
No. Assessment is the discovery, analysis and recommendation phase. Production migration, detailed implementation, application rebuilds and ongoing support are separate work packages with agreed scope and fees.
Bring your migration goals, source and target overview, approximate scale, known dependencies, priorities and decision owners. Existing inventory or architecture notes are useful. Tenant credentials are not needed for the initial discussion.
Yes, where included in the scope. Review can cover InfoPath, SharePoint Designer workflows, classic pages, custom JavaScript, SPFx, Power Apps, Power Automate and API integrations. The assessment identifies dependencies and suitable next steps.
Review can include groups, sharing configuration, external identities, broken inheritance, orphaned users and item-level cases where relevant. Findings should be checked against the target access design and a defined validation approach.
It can inform tool selection after the source, target, complexity and validation requirements are understood. The assessment is not tied to one vendor, and tooling licenses or implementation may require separate scope.
Duration depends on the size and complexity of the estate, available inventory, agreed access, legacy dependencies and review depth. Scope, responsibilities and expected milestones are agreed before the assessment starts.
Move forward with a clearer view
Discuss your estate, your migration goal and what an assessment should help you decide.
Assessment scope, fees and follow-on work are agreed separately.